
I have experience in civil engineering construction, project management, risk management, and ensuring compliance with quality assurance procedures, project specifications, and client requirements.
A civil engineer with +12 years with a demonstrated history of working in the construction industry.
I started my professional career with (The Engineering Office for Planning and Architecture) I worked as a site engineer to supervise the implementation and finishing works of residential buildings.
This experience allowed me to build a very good technical background in the field of construction, and then I was transferred to (The Egyptian International for Contracting and Real Estate Investment Co.) as a project engineer in the New Ismailia city project to supervise the implementation of (65) residential buildings, starting from excavation work to finishing works.
Then, I was transferred to work in the Kingdom of Saudi Arabia as (Team Leader) in (Global Falcom Trading Co.) and responsible for many projects, for example (sewel channels & riprap works for road protection, maintenance and deferent concrete works). After That, I moved to work with (Al-faal Arabia Co.) as (Site Manager) for Construction of for East Jeddah (Wild Life) Park Facilities within the projects of Jeddah Municipality.
Then, I worked as (Senior Civil Engineer) at (Al-Kobraish Company) for NWC
Projects (Pump Stations, Pipe lines, Water hammers and GLS Tank).
Now, I am working as (Consultant Civil Engineer) at (Al-Amr Group) for Supervision of NWC projects.
02/2024 – Present
Al-Amro Group for Engineering Consultancy
Review Scope of Work and Design, Method Statements, Project Quality Plan and Project Quality Control Procedure, Project Specification & Standers.
Review the submitted shop drawings according tinder drawing and BOQ.
Review the invoices of the completed works before submitted to Owner.
Supervising the implementation of water networks for the neighborhoods of South Khamis Mushait.
Review variation or change orders and valuation accounts.
Review a daily, weekly & monthly progress reports in coordination with contractors.
11/2021 – 02/2024
Al-Kobraish Investment & Contracting
Review Civil Scope of Work and Design, Method Statements, Project Quality Plan and Project Quality Control Procedure, Project Specification & Standers.
Prepare the invoices of the completed works to the different projects and approval of the consultant.
Resolving any unexpected technical difficulties, and other problems that may arise
Identify variation or change orders and prepare valuation accounts.
Review the supplier’s payment certificate by collecting the site timesheet, site request, all required approvals & documents as per company policy.
Make a daily, weekly & monthly plan in coordination with supervisors to fulfil each site daily requirement.
Coordinate with the consultant's representative and Site In-charge for all types of inspections to get their approval.
11/2020- 10/2021
Al-Faal Arabia for General Contracting Co.
Planning the work and efficiently organizing site works to meet agreed deadlines.
Coordinate with the project team to organize the work and meet the requirements
Prepares regular progress reports and ensures that the site complies with current health and safety regulations.
Responsible for reviewing drawings.
Monitors subcontractor’s work schedule, safety performance, and work quality and Review and check quantity surveying works and materials take-off to check the accuracy of quantities
Monitor progress and compile reports in project status with manage budget.
Review the supplier’s payment certificate by collecting the site timesheet, site request, all required approvals & documents as per company policy.
Distributing each activity for each location as per each project’s requirements
06/2017 - 10/2020
Global Falcom Trading Co
Responsible & Follow-up staff of the labours in different projects, directing them and providing support.
Manage budget and purchase equipment/materials
Follow-up of contractors and ensure the quality of implementation work
Prepare the invoices of the completed and ongoing works to the different projects (Monthly Invoice).
Contribute to the process of selecting and approving sub-contractors/suppliers for construction services and materials.
Review the quotations submitted by the supplier’s and ensure that the study matches the specifications in order to comply with the project budget.
Organizing the labours movement between projects according to problems if available.
Follow the invoices of petty cash and review them before sending them to the finance dept.
Review inventory the projects quantities.
Responsible for handing over the finished works to the consultant.
06/2015 - 05/2017
The Egyptian International Contracting and Real Estate Investment.
Supervising the implementation and finishing works in the number of (65) residential building.
Make requests for inspection and receipt of materials on the site and review them well.
Reviewing the shop drawings and bill of quantities and matching them on the site.
Continuously observe and monitor the interface of all construction activities for all disciplines, assist the managing contractor in resolving any interface coordination issues
Provide leadership to ensure prompt prioritization and coordination of all unforeseen issues at the site, escalating to the Construction Manager and Site Project Manager as required.
Testing and operating various materials in all buildings.
Delivering high-quality work and handing it over to the consultant.
Responsible for inventory the project quantities.
06/2014 - 05/2015
Engineering Office for Planning and Architecture
Supervising the implementation of residential towers.
Writing daily reports.
Supervising the pile foundations works.
Supervision of architectural finishes works.
2023 - 2025
Brooklyn Business School
2009 - 2014
Higher Institute for engineering and technology

The project is a system for transporting and distributing drinking water. The project aims to serve the Tarib Governorate, which is located east of the city of Khamis Mushayt, under the name of implementing drinking water networks for the Tarib Governorate, Contract No. (1), through the implementation of general site works, a transmission line, water networks, metal tanks, a chlorine building, a generator canopy, and a tank. Fuel, pump building, electricity building, and SCADA system (control and monitoring).

The project involves the construction of a Glass Lined Steel (GLS) water tank with a total storage capacity of 10,000 m³, including design, supply, installation, testing, and commissioning. The scope also covers the execution of associated water networks, including inlet and outlet pipelines and valve chambers, as well as all related mechanical works such as pumps, valves, piping, and control systems, in addition to electrical

Implementation of installation works for centrifugal pumps with electric motors that work interchangeably with the feature of measuring pressure with all the connection of the SCADA system, installation, testing and operation of an integrated chlorine system, installation, operation and testing of electrical control and operation panels. In additional Water hummer System with online pump operation

Concrete rafts, villas, precast factory mobilization, utility tunnel.

Slope protections, sewel channels, v-ditches, u-ditches, rock demolitions, excavation and backfilling works.

Box culvert, sewel channels, storm box, sewage line.

Riprap Work